omnibind Pre-treatment

Before you can begin levelling and setting any tiles in place, the substrate needs to be treated. With proper pre-treatment, you can apply a membrane that reduces or eliminates any compatibility problems, such as smooth or sealed surfaces, moisture, unevenness and/or loose dust, sand and dirt particles

COAT omnibind Universal plastic protection against damp and capillary water.
- Protection for moisture-sensitive surfaces in damp areas.
- Water-repellent barrier for cement and anhydrite screeds before a floor covering is laid using adhesive.
- Specially developed for waterproofing joints between the wall and floor, when combined with MB omnibind.